Racks of metal bar stock in a factory store
Photo: Assorted bar stock by Alister 77, Public Domain

Ask the stores manager of a typical Indian factory where material goes, and the honest answer is often "to the floor". A supervisor asks for twenty sheets, the store issues twenty sheets against a slip with the section's name, and from that moment nobody knows which job used them, how many were actually needed, or what happened to the remainder. At the annual stock-take the gap between book and physical stock is written off, and the cycle starts again.

Issuing material against work orders and their bills of materials is the single most effective control for this problem. This guide explains how it works, the practical issue methods, how to handle excess issues, returns and backflushing, and how to use the resulting variance reports. It is the operational heart of manufacturing inventory software.

The principle

Every unit of material that leaves the store goes to a specific work order. The work order's bill of materials (BOM) defines how much material that order should need. So for every work order, you can compare standard consumption (BOM × quantity) with actual issues. The difference — the variance — is where missing stock is found and explained.

Three rules make it work:

  1. No issue without a work order. Not to a section, not to a supervisor — to a work order.
  2. Excess requires a reason. Issues beyond the BOM quantity need a reason and, above a threshold, approval.
  3. Unused material comes back. Returns, offcuts and rejected material are recorded against the work order.

Getting the BOM right enough

Issuing against the BOM exposes BOM errors immediately: if the BOM says 2.4 kg per part and every job uses 2.9 kg, either the BOM is wrong or there is a real loss. Both are worth knowing. Don't wait for perfect BOMs before starting — start with the materials that matter most by value, check the first few weeks of variances, and correct BOMs where they were wrong. Our guide to bill of materials best practices explains how to structure them, including allowances for process loss, setup scrap and yield.

Issue methods

Kitting

The store prepares a kit of all materials for a work order before it starts, from a pick list generated from the BOM, and issues it as one transaction. Suits assembly, electronics and any work where many components go into each order. It also reveals shortages before the job starts rather than halfway through.

Issue on request

The shop floor requests material for a work order as needed, and the store issues against the request. Suits raw materials such as bar, sheet, coil and resin, where quantities are large and the job draws material over time. The system shows the balance remaining against the BOM for each request.

Line-side stock

Frequently used, low-value items — fasteners, consumables — are kept at the line and replenished in bulk, with consumption allocated to work orders by backflushing. Saves effort for items that don't justify individual issues.

Most factories use all three, chosen by material.

Backflushing: useful, with limits

Backflushing deducts material from stock automatically when output is booked: book 500 good parts and the BOM quantity for 500 parts is consumed. It removes issue transactions but also removes the check: if more material was actually used, backflushing won't show it until the stock-take. Use it for low-value, predictable items and keep actual issues for expensive materials, where variances matter. If backflushed items regularly show stock differences, move them to actual issue.

Excess issues

When the floor needs more than the BOM allows — because of rejections, a bad bar end, a setup that wasted material — an excess issue is recorded with a reason from a short list: rejection, setup, material defect, BOM error, other. Small excesses can be allowed automatically up to a percentage; larger ones need the supervisor's or production manager's approval. The point is not to stop production but to make every excess visible and explained.

Returns and offcuts

Material not used at the end of a job — part bags, bar ends, sheet remnants, unused components — must come back to the store against the work order. Without returns, the variance looks worse than reality, and usable material stays on the floor where it is eventually lost or used without a record. Offcuts with a useful size should be returned as their own stock items with dimensions, so they can be issued to later jobs; our guide to scrap and offcut management covers this in detail.

Variance reports

With issues, returns and output recorded against work orders, the variance report becomes one of the most useful in the factory:

  • By work order: standard versus actual consumption, with excess issues and their reasons.
  • By material: total variance over a month, revealing which materials leak most.
  • By part: parts that consistently use more than their BOM — candidates for BOM correction or process improvement.
  • By section or shift: where practice differs.

Review the largest variances weekly. Each has one of a few explanations: wrong BOM, unrecorded return, real loss, or rejection. Each explanation leads to a different fix.

WIP becomes visible

When material is issued to work orders, it becomes work-in-progress until the work order is completed. The system can then show WIP by work order — what material is on the floor, for which job, and for how long. Old WIP on jobs that should have finished points to stalled orders, forgotten material or unrecorded completions. Our guide to WIP tracking covers this further.

Rolling it out

  1. Clean the item master and BOMs for the main materials.
  2. Count the store and start with an accurate opening stock.
  3. Start with one material group — the most valuable — issued only against work orders.
  4. Add returns and excess issue reasons.
  5. Review variances weekly and correct BOMs.
  6. Extend to other material groups, using kitting, request or backflushing as suits each.

The hardest part is not software but discipline: the store must refuse issues without a work order, even when a supervisor is in a hurry. Management support for that refusal in the first weeks decides whether the system works.

Issuing from a phone

Issue against work orders works best when it is quick. A storekeeper with a phone scans the work order's QR code, scans the material's bin or lot label, enters the quantity and confirms. The system shows the BOM balance for that order and warns of excess. Printed pick lists for kits come from the same data. Paper slips that are typed in later reintroduce the delays and errors the system is meant to remove.

Substitutes and alternative materials

Factories often use a substitute when the BOM material is short — a different supplier's equivalent grade, a thicker sheet, a larger bar. Issuing a substitute against the work order, recorded as such, keeps consumption and traceability correct and shows how often substitution happens. Frequent substitution of the same item suggests the BOM should list approved alternatives, or that purchasing needs to change. Unrecorded substitution, on the other hand, creates stock differences for both items and can cause quality problems when a customer specifies a material.

Lots and heat numbers at issue

Where customers need traceability — automotive, pressure parts, food and pharma — the issue should record which lot or heat number went to which work order. Scanning the lot label at issue does this without extra effort. Later, when a finished lot needs to be traced, the work order links it back to the material lots issued to it. This is far more reliable than recording heat numbers on paper job cards. Our guide to heat number traceability explains the approach for steel.

Measuring improvement

Three measures show whether issue control is working: the share of issues made against a work order (aiming for all of them), the value of excess issues each month and their reasons, and the stock difference at each cycle count or stock-take. As discipline improves, excess issues should be explained, BOM errors corrected, and stock differences should fall. A rise in any of them is an early signal to investigate before the year-end count.

Consumables and indirect material

Not every issue belongs to a work order. Coolants, oils, gloves, grinding wheels, welding gas and cleaning materials are consumed by sections and machines rather than jobs. Issue these against a cost centre — a section or machine — with the same discipline: recorded quantity, a person, a date. Consumption per machine hour or per unit of output, reviewed monthly, quickly shows unusual use. Some factories later allocate these costs to jobs through machine hour rates; others simply control them by section. Either way, they should not leave the store unrecorded.

When production quantities change

Work orders change: a customer reduces an order, a job is split, or more parts are made to cover expected rejections. The material issued should follow. Reducing a work order should prompt a return of unneeded material; increasing it should allow additional issue against the new BOM quantity without counting as excess. Closing a work order with material still issued and unused should be blocked until it is returned or explained. These rules keep WIP honest and stop small balances from accumulating on old orders.

Stores layout supports discipline

Issue control is easier when the store is organised for it: a counter or window where issues happen, material in labelled locations, a staging area for kits waiting to be collected, and a separate area for returns awaiting inspection. When anyone can walk into the store and take material, no software can control consumption. Simple physical changes — a counter, a lockable door, defined hours for routine issues and a procedure for urgent ones — often matter as much as the system itself.

A worked example

A fabrication company making steel structures and enclosures lost a noticeable share of its steel value each year in stock-take differences. Steel was issued to sections on slips, offcuts piled up near the cutting machines, and BOMs existed only for some products.

The company created BOMs with cutting allowances for its main products, started issuing steel plate and sections only against work orders, and introduced returns of offcuts above a minimum size as their own stock items. In the first month, variances showed that two product BOMs understated plate consumption, and that offcuts were being cut from new sheets because nobody could see what remnants existed. BOMs were corrected, remnants were issued first, and the stock-take difference at the next count was a fraction of the previous year's.

The payoff

Issue against the BOM is not glamorous, and it asks for discipline from stores and production alike. But it is the control that turns inventory from a yearly write-off into a weekly explanation, that makes job costs believable, and that tells purchasing what the factory really consumes. Most of the other benefits of manufacturing software — accurate planning, reliable costing, traceability — depend on it.

Working with Corposol

Corposol builds custom inventory and BOM software for Indian manufacturers, as part of our manufacturing software work. Read our use case for an auto component supplier. All custom code is transferred to you on final payment.

Frequently asked questions

What does issuing against the BOM mean?

Material leaves the store only against a work order, in the quantities the bill of materials says that order needs. Anything more requires an excess issue with a reason and approval; anything unused comes back as a return.

What is backflushing?

Recording material consumption automatically from production output: when 100 parts are booked, the BOM quantities for 100 parts are deducted from stock. It saves effort but hides variances, so it suits low-value, predictable items better than costly materials.

Why doesn't stock match the register even when issues are recorded?

Usually because issues are recorded without a work order, quantities are approximate, returns and offcuts aren't recorded, or BOM quantities are wrong. Issue against work orders, with returns, exposes each of these.

How accurate do BOMs need to be?

Accurate enough that variances mean something. Start with the BOMs for your highest-value materials and parts, check them against actual consumption, and correct them as variances reveal errors.

  • Material issue
  • BOM
  • Material consumption
  • Inventory control
  • Work orders

Let's discuss your factory's software

Tell us about your process or idea. You'll get a free consultation and a clear, fixed quote — no obligation.

  • Free consultation
  • Prototype before you commit
  • Fixed, itemised quote
  • You own the software

Get a free quote

We reply within one working day. Your details are never shared.